Energy Cube Constance

Services:

Service Phase 1-3

Parts of Service Phase 5-8

Region:

- / 900m²

Architect:

Municipal Utilities Konstanz GmbH

Finishing date:

2011

Owner:

Municipal Utilities Konstanz

Additional information:

construction:

  • Large-sized mullion/transom facade system; element size up to 3mx4m impact-proof
  • Two layerd ventilation system in the window area with inside sun and glare protection
  • LED-backlight in the opaque fields
  • Parallel vent windows, two layered with internal rotary wings
  • Southside all-over with integrated, large-sized, transparent PV-Elements